If you have multiple high risk activities on site you already know the problem: permits pile up, risks slip through and accountability gets lost. The Integrated Safe System of Work (ISSOW) permit management solution solves this by combining permit to work (PTW, risk assessment and isolation control in one governed system. The result is fewer surprises, cleaner handovers and a traceable safety record that stands up to audits – whether you’re in oil & gas, utilities, construction or manufacturing.
What Is ISSOW (Integrated Safe System of Work)?
An Integrated Safe System of Work (ISSOW) is a structured framework that combines PTW, hazard identification & risk assessment (often HIRA) and isolation/LOTO into one controlled workflow. ISSOW adds discipline to everyday tasks – hot work, confined space entry, electrical maintenance – by ensuring the right controls are identified, authorized, implemented and verified before work starts.
Why ISSOW Permit Management Matters:
ISSOW gives you standardization, governance and visibility. Instead of scattered spreadsheets or siloed forms you get one chain of custody for the entire job – planned, approved, executed and closed with evidence.
ISSOW vs. Permit-to-Work: How They Fit Together
A permit-to-work is the formal authorization to perform a defined task under specific conditions. ISSOW is broader: it wraps PTW into a complete safety management layer that includes risk registers, control libraries, isolations, roles, competency and auditing.
-
PTW = the work authorization document and checks.
-
ISSOW = the governance system around PTW (people, data, processes, oversight).
When you implement ISSOW you don’t replace PTW – you elevate it. Expect clearer interfaces with operations, maintenance and HSE; tighter control of simultaneous operations (SIMOPS); and better reporting with KPIs like permit cycle time, overdue isolations and audit findings.

ISSOW Permit Workflow:
A well functioning ISSOW follows a predictable, auditable flow. Map yours to these stages:
1. Request
The Performing Authority (PA) initiates a job with scope, location, planned date/time and attachments (P&IDs, JSA).Identify hazards (energy sources, atmosphere, access, lifting) and assign controls from a centralized library (gas testing, ventilation, barricading, PPE, standby man, fire watch).
2. Risk Assessment (HIRA/JSA)
Identify hazards (energy sources, atmosphere, access, lifting) and assign controls from a centralized library (gas testing, ventilation, barricading, PPE, standby man, fire watch).
3. Isolation Planning (LOTO)
Define mechanical/electrical/process isolations, tags and test/try steps; pre-plan reinstatement.
4. Review
Area Authority (AA) validates scope, checks SIMOPS conflicts and ensures competence and permits prerequisites (e.g. hot work, confined space certificates).
5. Approval & Issue
Permit is authorized; toolbox talk confirms understanding; conditions and boundaries are communicated and displayed.
6. Execution & Monitoring
Ongoing gas tests, shift handovers and permit extensions follow defined rules.
7. Close & Reinstatement
Work verified complete; isolations removed in sequence; lessons learned captured; documentation archived.
Roles & Responsibilities (Area, Performing, Isolating Authority)
Clarity on who does what is the backbone of ISSOW:
Area Authority (AA):
Owns the plant/area. Screens requests, checks SIMOPS, validates risk controls and ensures work boundaries are respected.
Performing Authority (PA):
Leads the work party. Ensures controls are in place, conducts toolbox talks and maintains permit conditions throughout the job.
Isolating Authority (IA):
Plans and executes isolations, confirms zero-energy state and oversees safe reinstatement.
Permit Coordinator / Controller (optional):
Schedules work, prevents clashes and maintains the live permit register.
HSE Advisor (supporting):
Audits permits, observes field practices and verifies the effectiveness of controls.
Align these roles with competence requirements and formal authorization. A simple RACI (Responsible, Accountable, Consulted, Informed) matrix prevents drift from procedure.
Implementation Tips & Best Practices for Safety Managers
Audit your current PTW maturity. Where are permits weak—scope clarity, SIMOPS planning, shift handovers or isolation quality?
Build the backbone first:
-
Create a minimal viable controls library that covers your top 10 job types (e.g. hot work, confined space, line breaking).
-
Standardize permit templates and toolbox talk checklists.* Define competencies for AA/PA/IA and enforce sign-off rules.
Digitize for consistency:
-
Use e-PTW/ISSOW software for form logic, photo evidence, live dashboards, automated escalations and audit trails.
-
Link to CMMS/ERP for permits to work orders and equipment
Measure what matters:
-
KPIs: permit cycle time, % permits with HIRA, overdue isolations, audit non-conformances per 100 permits, toolbox talk compliance, SIMOPS conflicts prevented.
-
Review KPIs weekly; use to update controls and training
Avoid common pitfalls:
-
Overly complex forms no one reads; poor change control; unclear boundaries between ops and maintenance.
-
Fix with short field-tested checklists, regular coaching and visible leadership.
Sustain the gains:
Done right ISSOW permit management is a living system—not just a stack of permits. With clear roles, disciplined risk assessment, robust isolation and digital traceability you’ll reduce incident potential, increase productivity and get audit-ready.
Frequently Asked Questions:
1) What is ISSOW?
ISSOW (Integrated Safe System of Work) is a governed framework that combines permit-to-work, risk assessment and isolation/LOTO to control non-routine work safely. It standardises roles, workflows and documentation so hazards are identified, controls are verified and work is auditable end-to-end.
2) How is ISSOW different from a standard Permit to Work (PTW)?
PTW authorises a specific job under defined conditions. ISSOW is broader: it wraps PTW with governance—risk assessment, isolation management, roles/competence, SIMOPS control and auditing—so the entire job lifecycle is managed consistently.
3) Which roles are typically involved in ISSOW?
Common roles include Area Authority (owns the plant area), Performing Authority (leads the work party), Isolating Authority (plans/executes isolations). Many sites also use a Permit Coordinator and HSE Advisor for scheduling, quality checks and audits.
4) What are the key steps in an ISSOW permit workflow?
Request → HIRA (JSA) → Isolation planning (LOTO) → Review (incl. SIMOPS) → Approval/Issue → Execution & monitoring → Close & reinstatement → Lessons learned/archiving. Each step is documented for auditability and compliance.
5) How does HIRA fit into ISSOW?
HIRA identifies hazards for the job and links to controls (e.g. gas testing, ventilation, PPE, fire watch). Controls must be assigned, verified and monitored during execution and confirmed at closeout to ensure residual risk is acceptable.
6) Which industries benefit most from ISSOW?
High-hazard and asset-intensive industries—oil & gas (onshore/offshore), utilities, chemicals, mining, manufacturing, construction—reduce incident potential, improve coordination and get audit-ready safety records.
7) How does electronic PTW (e-PTW) improve ISSOW?
e-PTW digitises forms, embeds mandatory fields, flags conflicts, enables mobile evidence capture and provides live dashboards. Reduces errors, speeds approvals, improves visibility and strengthens compliance with automated trails and reports.
8) What are common ISSOW implementation mistakes to avoid?
Pitfalls include overly complex forms, weak competence controls, poor SIMOPS planning and unmanaged changes. Start with a minimal controls library, enforce clear role authorisation, audit permit quality and continuously refine prompts based on field feedback.